MPC
Shopping Cart
(0 Items) £0.00

Gold Star Service Contract

This page explains everthing that is included in the Gold Star Service Agreement. At the bottom of this page is a printable version of the text, as well as an online application form that will help our dedicated office team to create your own tailored servicing agreement. Please use the tabs to the left-hand side of this page to view our other maintenance contracts.
 
Of course if you would like futher information on any of our contracts, or would like us to process you application you can either email: michelle@mpcservices.co.uk or call: 01773 767612
 
Items Covered By Total Maintenance Agreement
 
• Inspection Visits
• All replacement
parts (where applicable): Motor, Gearbox, Compressor, Pumps, Bearings, Drive Belt,
  Electrical Components etc (excluding vandalism)
FREE call out
• Clearance of up to ** third-party blockages: treatment plant & pump station only (where
  applicable)
• Service visits(s) per year with detailed service reports
• All travel costs and expenses
• All consumables (excluding vandalism)
• All labour costs
• Cancellation Type A/B - please see below
 
What Is Included In My Service Agreement?
 
Electrical Testing...
 
• Electrical health check of pumps/motors etc via megga meter phase-to-earth and phase-to-phase.
   This is to build trends to determine any deterioration in electrical insulation.
• Amps drawn via clamp meter to compare with manufacturers recommendations and electricity trip
   rating.
• Voltage/current trace through components.
• All panel components for integrity, duty assist/changeover operation.
• Alarm tests when applicable for:
     - Pump Trip
     - Hi-Level
     - Loss of Pressure
     - Loss of Rotation
     - Loss of Power
 
Mechanical Testing...
 
• Mechanical test of following items when applicable:
     - Pumps for blockages, defects, oil leaks etc
     - Hanging chains for corrosion
     - Floats for current depth, operating stroke
     - Pipework for splits, corrosion
     - Check valve for correct operation
     - Drive trains for alignment
     - Guide rails
• Bacterial processes for correct growth (Sewage Treatment Plant).
• Physical test of lid, frame and surrounding area.
• Visual inspection of the whole systwm for defects.
• Any causes for concern put forward to customer.
• Detailed service report provided
 
Optional
 
Desludge Management (This helps to maximise efficiency of plant and keep within discharge
   consent levels)
Sampling (Effluent quality samples via accredited laboratories).
 
Servicing Visits
 
N.B. For the owners of Conder CT6 and Conder CT12 sewage treatment plants, an annual pump replacement will be included as part of all Gold Star Service Contracts and undertake at the time of the service visit.
 
If on annual service, or a breakdown call out under a Gold Star Service Contract units are assessed as being faulty due to flood water ingress, blocked drains or power failures/surges caused by external 3rd parties then MPC Services (UK) Limited reserve the right to pass on any subsequent costs for the repair of the units and any tankering charges for the removal of accumulated waste water to the customer.
 
Cancellation Fees
 
Type A - No remedial works carried out within 30 days before or after contract commences. If cancelled in the 1st year - 100% 1st year, 75% 2nd year and 50% 3rd year payable. If cancelled in the 2nd year - 100% 2nd year, 75% 3rd year payable. If cancelled in the 3rd year - 100% 3rd year payable.
 
Type B - Remedial works carried out within 30 days before or after contract commences, or remedial works included in Gold Star Contract, 100% of remaining periods chargeable, regardless of year in which contract is cancelled.
  
Payment Terms & Conditions
 
i.
ii.
iii.
iv.

v.

vi.



vii.
Prices subject to VAT where applicable
Payment in full within 28 days of dated invoice
Cheques to be made payable to MPC Services (UK) Limited
All equipment and goods supplied remain the property of MPC Service (UK) Limited until fully
paid for
MPC Services (UK) Limited reserve the right under the Late Payment of Commercial Debts
(Interest) Act 1998 to charge interest on overdue accounts at the rate of 8% above base rate
It is understood that in order to comply with the manufacturer's requirements, the system
should be desludged at the recommended intervals. MPC Services (UK) Limited reserve the
right to view tankering receipts at any time deemed necessary in order to establish this has
been complied with
All new Service Contracts are only agreed by MPC Services (UK) Limited as valid once a 
satisfactory site survey has been undertaken to establish the unit is fully operational.
Should this survey reveal remedial work is required, then the Contract shall only be 
effective once this work has been satisfactorily completed.

mpc-pdf-file.gif  Gold Star Service Agreement - Printable Version.pdf
  Size: 81.0 KB
  Added: 28th September 2011
/images/tricel_home_banner
/images/free_delivery_banner
/images/price-match-guarantee_3
/images/new_offers_ksb501_1
/images/new_offers_conversionkit
/images/servicing_side_box_2
/images/need_advice_side_box
/images/sagepay_side_box
/images/join_us_on_facebook